广州正菱|三菱
当前位置:首页 >> 资料下载 >> 三菱 >> 伺服驱动器和伺服电机 >> 三菱 三菱-Spring Clamp Terminal Block Model Q6TE-18S 用
三菱 三菱-Spring Clamp Terminal Block Model Q6TE-18S 用户手册
资料介绍:

5. Cable Installation Procedure
(1) Cable Installation
Insert the tool into the square shaped hole, which corresponds to the terminal you wish to use.
While the tool is inside the hole, insert the wire into the circular shaped hole (as shown below).
Remove the tool from the square shaped hole, taking care not to remove the wire.
After the wire has been clamped, gently pull the wire to confirm that it is secure.
Square shaped hole
Circular shaped hole
Wire strip length:
8mm to 11mm *1

Wire

Tool *2
[Caution]
*1: Take care that the wire strip
length is between 8mm to
11mm.
If the wire strip length is too
long, this will expose the bare
wire, which increases the risk of
electric shock or short circuit.
If the wire strip length is too
short, this will result in the wire
not being securely attached.
*2: When mounting/removing the
cable, make sure to use the
dedicated tool, i.e., a tool
dedicated to spring clamp
terminal block, and insert the
tool vertically into the hole.
If a general slotted screwdriver
is used instead of the dedicated
tool, or the tool is not vertically
inserted, the spring clamp
terminal part or terminal block
resin part might be broken.
(2) Cable removal
Insert the tool into the corresponding square shaped hall until it stops.
伺服马达 HF-SP201
伺服马达 HF-SP502
伺服马达 HF-SP702B
薄型电源模块 Q61SP
伺服马达 HF-SP121B
薄型电源模块 Q61SP
伺服马达 HF-SP52
伺服马达 HF-SP352
伺服马达 HF-SP352B
伺服马达 HF-SP201B
伺服马达 HF-SP121
伺服马达 HF-SP51B
伺服马达 HF-SP102
脉冲捕捉模块 A1SP60
伺服马达 HF-SP152B
伺服马达 HF-SP81B
伺服马达 HF-SP102B
伺服马达 HF-SP81
伺服马达 HF-SP702
伺服马达 HF-SP202B
伺服马达 HF-SP202
伺服马达 HF-SP52B
伺服马达 HF-SP152
伺服马达 HF-SP502B
伺服马达 HF-SP51
三菱 三菱-Spring Clamp Terminal Block Model Q6TE-18S 用户手册     三菱 三菱-Spring Clamp Terminal Block Model Q6TE-18S 用户手册
相关下载