11、三菱 FX 三菱-FX-2DA 用户指南
*4 Connect the ground terminal on the FX-2DA with
the ground terminal on the base unit of the
programmable controller. Use class 3 grounding
on the base unit, if available.
*1 Use a twisted
12、三菱 MRZJW3 三菱-MRZJW3-MOTSZ111E 安装 指南
In this Installation Guide, instructions at a lower level than the above, instructions for other functions, and so on
are classified into "POINT".
After reading this Installation Guide, always